Davao City Bypass Construction Project
45.5-kilometer project connecting Toril to Panabo City with the Philippines' first long-distance mountain tunnel.

Samal Island–Davao City Connector (SIDC) Bridge
3.98-kilometer, four-lane extradosed bridge project linking Davao City and Samal.

Davao Public Transport Modernization Project (DPTMP) / HPBS
Establishing a modern bus-based public transport system with a 672-kilometer network and 1,100 buses (electric and Euro-V diesel). Partial operations expected in 2026.

Davao International Airport Modernization
Upgrades to the airport including passenger terminal building expansion.

Davao City Coastal Road
17.8-kilometer bypass road designed to decongest city proper, act as storm-surge barrier, and serve as public promenade. Segments A, B, C are operational/near completion.

Waste-to-Energy (WTE) Plant
Proposed facility in Tugbok District designed to process 600 tons of solid waste daily, generating 11 MW of electricity. Estimated cost ₱5B-₱7B.

Local Infrastructure Projects
740 infrastructure projects completed between 2020 and 2024 including roads, bridges, irrigation, and public buildings.

Flood Control Initiatives
Revetment walls and river embankments along the Talomo River.